Allied analyst targets now run from C$4.75 to C$5.50
UPDATE on Allied Properties REIT: the analyst repricing that followed the distribution cut is now complete, and the full set of reported targets sits in a tight, much lower range.
Nov 1 aggregator reports add three more cuts. TD cut its target to C$4.75 from C$6.50, with a Hold rating, the lowest target in the set. Desjardins cut to C$5.00 from C$9.75, also Hold. Scotia cut to C$5.50 from C$9.00, with a Sector Perform rating.
Those join the two cuts covered on Oct 31: National Bank at C$5.25 and Raymond James at C$5.00.
The reported range is now C$4.75 to C$5.50. The aggregator consensus target of C$8.08 is stale against that new range and should not be used.
These figures are flagged unverified against the primary analyst notes. They are sourced from aggregator reports of the notes, not from the notes themselves.
For investors, the takeaway is the reset itself. Every firm in the set cut, including the lowest target now sitting at C$4.75. Price Allied exposure on the new range and on the reset distribution, and verify any single target against the primary note before acting on it.
Source: Aggregator reports of analyst notes, Nov 1, 2026, flagged unverified against the primary notes.
Categories
Recent Posts

CAPREIT posts $173.9M Q3 loss as occupancy holds at 97.2%

Permira takes majority stake in Flint Group at a valuation above $1.5B

Canada US trade talks: Ottawa says midterm result will not change its diversification plan

Dream Industrial REIT lifts comparative NOI 8.5% in Q3 on 32.3% leasing spreads

Crombie REIT renewal growth hits 13.9% in Q3 as occupancy matches record at 97.7%

Monette Farms seeks CCAA extension as 350,000 acre operation works through sale process

Champions Group buys Bardi Heating, Cooling, Plumbing and Electric in Atlanta

Specialty healthcare consolidation adds veterinary network and dental deal in one week

Caliber Auto Glass acquires Arrow Auto Glass and reaches 44 states

Clearview Garden Estates receivership opens second claims process with Jan 26 deadline


